If a scheduled report is no longer needed prior to the scheduled "end date", you can stop the scheduled report so the recipient(s) will no longer receive it.
Stop a scheduled report
- Go to Reports > Reports
- Click the "Edit" icon next to the scheduled report. This will take you to the last page of the report builder
- De-select the "Schedule the Report" checkbox. This will deactivate the scheduling of the report
- Click "Save"
Tips
- Make sure there is a check icon under the "Scheduled" column as this is an indicator that the report is scheduled
- You can remove the scheduling without removing the report itself